CRL Normandy Temporary Services Bridge

 
CRL Normandy Temporary Services Bridge

Key Elements:
• Walk through truss bridge on two towers
• Two supporting towers, clad with webforge sheets
• Walkway raised 1m to accommodate space for extensive service pipes and ducts
• Pre-fit all service pipes and ducts into bridge span as well as support towers
• Thermal metal spray to SHS truss members
• Built to NZS5131 and related codes

Challenges: such as deadline/installation obstacles and solutions of interest to a client.
• Bridge installation had to be coordinated around cars and trains as a congested and complex site. Solution was to fabricate complete modules offsite for erection in short shut.
• Provision to be made for connection to existing services, where connections and quantum had yet to be defined.
• Transport of main span on jinker trailer system from Hamilton to site to be lifted directly onto towers
• One Bridge Tower was fixed and other tower was on sliding bearing to allow movement . Existing Pipes were buried and so restrained while the temporary pipes could move with the TSB , this was solved by fixing a double knuckle joint which allowed pipe movement in all direction
• NZS 5131 had just come into effect and required some work with consultants on interpretation of QA requirements in particular welding details

Customer: Link Alliance
Location: Normandy street, CRL, Auckland
Industry: Bridges and Infrastructure
 
 
 
 
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge
CRL Normandy Temporary Services Bridge