Bridge over rail lines and access ramps and stairs down to the platforms. Walk through lattice truss structure with SHS members and aluminum panels balustrades
PFS were engaged to perform a full shell and lamella replacement on the Evaporators for Number 5 recovery boiler. This was carried out in an 11 day shut period at Kinleith Mill.