Tasman #2 Recovery Boiler

 
Tasman #2  Recovery Boiler

PFS Manufactured and installed super heater and screen tubes for the No.2 Recovery Boiler upgrade. The project included

  • Procure bolier tubes from offshore
  • Bend tubes to differnt radii to suite return tubes
  • Shop manufactore new heater banks
  • NDT and hydrotest super heater tube banks
  • crane super heater bank from truck
  • lower through roof of recovery boiler
  • weld bank into headers
  • bring recovery boiler back into operation after hydrotest

    Customer: Carter Holt Harvey
    Location: Kawerau
    Industry: Pulp and Paper
     
     
     
  •  
    Tasman #2  Recovery Boiler