Laminex were relocating their Auckland facility into a new line at their Auckland borad plant.
KEY FEATURES:
Over 1km of Stainless Steel tube to provide resin from the resin tanks to the press.
4 Resin tanks in a bunded area
relocation of pumps and valves from auckland plant
relocation of speciliast mixing plant and platforms from auckland.
CHALLENGES
Measure up existing plant in Auckland for all pipe connections , so could connect new piping to plant when relocated
Install all piping to pipe rack inside the building while good access is available before plant is relocated
Fabricate SS Resin vessels and install in bunded area to meet HAZOP requirements
optimise the slavage relocation and reinstallation of specialist plant pumps valves and mixers.
Customer: Laminex
Location: Hamilton
Industry: Industrial Plants