LAMINEX BOARD PLANT- RESIN LINES & VESSELS

 
LAMINEX BOARD PLANT- RESIN LINES & VESSELS

Laminex were relocating their Auckland facility into a new line at their Auckland borad plant.

KEY FEATURES:

  • Over 1km of Stainless Steel tube to provide resin from the resin tanks to the press.
  • 4 Resin tanks in a bunded area
  • relocation of pumps and valves from auckland plant
  • relocation of speciliast mixing plant and platforms from auckland.

    CHALLENGES
  • Measure up existing plant in Auckland for all pipe connections , so could connect new piping to plant when relocated
  • Install all piping to pipe rack inside the building while good access is available before plant is relocated
  • Fabricate SS Resin vessels and install in bunded area to meet HAZOP requirements
  • optimise the slavage relocation and reinstallation of specialist plant pumps valves and mixers.

    Customer: Laminex
    Location: Hamilton
    Industry: Industrial Plants
     
     
     
  •  
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS
    LAMINEX BOARD PLANT- RESIN LINES & VESSELS