PFS has for years during the anual shuts done refurbishment work on the OJI boilers.In the shut in late 2019 PFS worked on both the #8 Primary Boiler and the #5 Recovery boiler.

The work on the #8 primary boiler was on the refurbishment and maintenance which included;

  • removal of the grate to access tubes
  • welding of tubes from inside the boiler
  • welding of tubes form under the grate
  • maintenance of grate drives and rollers

    Customer: OJI Fibre Solutions
    Location: Kinleith
    Industry: Pulp and Paper
     
     
     
  •  