KINLEITH #5 Recovery Boiler
In a Shut in November 2019 PFS as well as work on the #8 Primary Boiler did refurbishment work on #5 Recovery Boiler, Sperheater.
The work done in the shut included:
Location: Kinleith
Industry: Pulp and Paper
In a Shut in November 2019 PFS as well as work on the #8 Primary Boiler did refurbishment work on #5 Recovery Boiler, Sperheater.
The work done in the shut included: