KINLEITH #5 Recovery Boiler

 
KINLEITH #5 Recovery Boiler

In a Shut in November 2019 PFS as well as work on the #8 Primary Boiler did refurbishment work on #5 Recovery Boiler, Sperheater.

The work done in the shut included:

  • Realign 3 superheater pendants
  • Cut tube and take tube samples
  • Replacement of barrel to heat exchanger with one fabricated befor the shut by PFS

    Customer: OJI Fibre Solutions
    Location: Kinleith
    Industry: Pulp and Paper
     
     
     
  •  