Kinleith #4 Recovery Boiler

 
Kinleith  #4 Recovery Boiler

Cut out existing airports and replace with straight tubes.
Work included:

  • All work done during a shut
  • Cut out existing airports and prep tube ends
  • Bend tubes to tie into existing tubes at top and bottom of airport
  • Weld tubes NDT and hydro.

    Customer: OJI
    Location: Kinleith
    Industry: Pulp and Paper
     
     
     
  •  