McKee Water Treatment Plant
As a contractor to Veolia Water Solutions, PFS Engineering was responsible for the installation of a demineralisation and potable water treatment plant for the Todd Energy McKee Peaker plant. This involved;
• Installation of 2x Reverse Osmosis Skids
• Installation of 2x continuous de-ionisation skids
• Installation of filter banks, UV treatment and chemical dosing equipment
• Associated piping in schedule 80 PVC
• Double-skinned transfer lines for chemical transfer from bunded area to RO skids
• Management of electrical works, subcontracted to Wells I&E Ltd
Location: Todd Energy McKee Power Station, Taranaki