Full fabrication set of drawings as well as assembly and installation were completed after design for the pipe bridge was handed over by Babbage.
Key Features:
- After fabrication and coating, the unit was landed in 2 completed spans in our yard.
- Our ASME welders fitted the pipe to the bridge and Best Insulation completed the cladding.
- Due to the 30m length of the main span, specialist transport was provided by Roach’s to Pokeno.
- Once on site, a twin crane lift was required to place the main span on the towers followed by the shorter roadway span.
- Pipe ranging from 50mm SS to 300mm SS and gas, steam and, carbon pipe joined where the spans met.
- Upon completion of QA package, a hydro was conducted to certify the completed lines.