Maintenance works for Contact Energy's Energy Plant at Te Rapa Diary factory during annual shut.
Key Features:
PFS has carried out work on the boiler for at least the last decade.
- Window holes in ecomomiser header to endescope or plug tubes and then weld back header seal plate.
- Boiler tube repair.
- Replacing tubes.
- Modifations to heat deformed tubes.
- Fixing of tube supports.
- Refurbishment of economiser.