NZ Steel traditionally procured this sort of work from Europe. By getting us to do the work, the lead time was significantly reduced. 

Key Features:

  • ‘Hockey stick’ Boiler Tubing Sch80 Pipe connected to 2# header pipes to form skirt.
  • Boiler tubing with 180 deg bends to return flow back to header.
  • Specialized jig designed for the fabrication of the skirt.
  • Hydro was planned by Project Engineers to get it properly vented and drained.
  • 3rd Party NDT of all boiler tube welding to ASME code.
  • Fabrication to zero tolerance to fit Skirt to existing process plant.

Challenges:

  • Rolling headers to the exact circumference to fit perfectly on jig design.
  • Fitting the two headers together with very limited clearance.
  • Template, ex 3D design, to fix all refractory 1200 off twigs in perfect position.
  • Welding each end of 140 off 180-degree bends to boiler tubing to comply with code and specifications.
  • A special frame was designed and used to vent all air as the assembly was filled for Hydro.
  • After hydro high pressure, heated air was used to remove water and dry tubes.
  • Successful Installation during a short shut due to preplanning and high-quality fabrication.

Responsive
Lead-time

Responsive
Lead-time

Skilled
People

Skilled
People

Integrated Design
Capability

Integrated Design
Capability

Scale &
Capacity

Scale & Capacity

New Zealand
Owned And Operated

New Zealand
Owned And Operated

Quality
Assured

Quality
Assured

Make an Enquiry Start a conversation with our team.