PFS was brought in to shop fabricate and install a new pipe bridge and steam piping.
Project included:
- Pipe bridge in 3 sections.
- Join 60m of pipe bridge in the shop.
- Spool and fill with steam pipes and insulate, as well as stainless condensate or water pipes.
- Cut the pipe at the end of each section to be rejoined on site after erection.
- Site installation of pipe bridge.
- Steam piping was run to process plants and tanks, connecting and insulating them.
- Commission statutory inspection plant and complete MDR.