Maintenance | Pulp & Paper Kinleith #8 Primary Boiler

PFS has for years during the annual shuts done refurbishment work on the OJI boilers. In the shut in late 2019 PFS worked on both the #8 Primary Boiler and the #5 Recovery boiler.

Key Elements:

  • Removal of the grate to access tubes.
  • Welding of tubes from inside the boiler.
  • Welding of tubes formed under the grate.
  • Maintenance of grate drives and rollers.