In a shut in November 2019, refurbishment work on the #5 Recovery Boiler, Superheater. Also worked on the #8 Primary Boiler.
Key Elements:
- Realign 3 superheater pendants.
- Cut tube and take tube samples.
- Replacement of barrel to a heat exchanger with one fabricated before the shut by PFS.