PFS was engaged to deliver a turnkey solution for the complete replacement of the Steam Boilers 1 and 2 stack, based on the design provided by Dobbie Engineering. The project scope included the safe removal and disposal of the existing stack, followed by the full supply, fabrication, and installation of a new 27m stainless boiler stack system. Our team managed all aspects of the project from start to finish, ensuring compliance with engineering specifications and seamless integration with existing plant infrastructure.
Key Elements:
Turnkey Solution: PFS delivered a complete, start-to-finish solution for the boiler stack replacement.
Client-Provided Design: Design was supplied by Dobbie Engineering.
Scope of Work:
- Safe removal and disposal of the existing boiler stack.
- Full supply, fabrication, and installation of a new stack.
Stack Details:
- New boiler stack was 27 meters tall.
- Constructed from stainless steel.
- Diameter ranged from 2.6 meters (widest) to 1.2 meters (narrowest).
Additional Features:
- Insulation and cladding installed on the cyclone cone section.
Project Execution:
- PFS managed all aspects of the project.
- Ensured compliance with engineering specs.
- Delivered seamless integration with existing plant infrastructure.