Condenser Builds for a Sunshine Electricity sugar mill biomass cogeneration water plant.
2 Condensers fabricated and exported to Condong and Broadwater power plants in New South Wales.
Key Features:
- Condensers were 11m long, 3m diameter and 50 tonne.
- Steam Inlet - 6x3x3m and 9 tonne. Hotwell - 4x2x2m and 4 tonne
- Steam inlet and a hotwell fixed to each condensor.
- Barrel, hotwell and steam inlet, constructed out of 16mm boiler plate.
- 3m diameter flanges and matching cover plates, constructed out of 60mm boiler plate.
- All components profile cut by PFS, including sag plates, flanges, cover plates and stiffeners.
Challenges:
- Each condenser has 3,300 tubes which pass through 22 sag plates and expand into tube plates (316L and Duplex).
- Transportation of 11m long, 50 Tonne Condensers.